Test fee-waterfall priority, OIML error limits and localisation speeds before drafting tender schedules.
Exported Markdown basis attached to committee terms of reference
Instruments · Open working models
Every figure in a national programme should survive direct inspection. The control room runs a live seeded simulation beside the status board of all eighteen Tie Wang engineering, audit and finance instruments.
01 · Status board
A model earns trust only when an independent reviewer can change the inputs, read the equations and verify that the output breaks where reality breaks.
Tie Wang publishes open, deterministic models across finance, metrology, operations and transport so authorities, lenders and local partners can stress-test programme mechanics before negotiating a single schedule. Each live instrument below executes a pure TypeScript model in the browser, syncs parameters into the URL, draws live SVG exhibits and exports CSV and Markdown summaries without transmitting inputs to any server.
| Code | Instrument | Heat | Domain | Primary computed output | Status |
|---|---|---|---|---|---|
| INS-01 | Register-first deployment planner How much upfront capital is saved by launching a national register before phasing field hardware? | lender | cross-sector | Upfront capital avoided before first revenue (USD m) | Live |
| INS-02 | Concession DSCR stress tester Where does debt service coverage break under volume, tariff and ramp delays? | lender | finance | Minimum DSCR, lock-up count and default breach year | Live |
| INS-03 | Monte Carlo cashflow fan What is the P10 to P90 distribution of project equity returns under correlated shocks? | lender | finance | P10, P50 and P90 equity IRR and downside probability | Live |
| INS-04 | Measurement uncertainty budget Does a custody-transfer metering chain stay inside the statutory OIML permissible error? | auditor | metrology | Expanded uncertainty U (k=2) against OIML R 117 class limit | Live |
| INS-05 | Gold mass-balance reconciler What variance separates declared mine output, refinery fineness and customs export weight? | auditor | resources | Fine-gold mass variance (g, %) and royalty exposure | Live |
| INS-06 | Telecom re-rating gap estimator How much declared revenue diverges under bypass, unbilled termination or tariff drift? | auditor | telecom | Annual re-rated revenue and fiscal variance (USD m) | Live |
| INS-07 | State-first fee waterfall simulator How are verified revenues split between the Treasury, operating costs and debt service? | lender | finance | State sweep share, DSRA funding and residual equity | Live |
| INS-08 | Localisation schedule planner How fast can engineering and operations roles transfer to national staff without losing SLA? | time | operations | National staffing curve, expatriate step-down and SLA floor | Live |
| INS-09 | Renewal wave reserve calculator What annual lifecycle reserve prevents hardware and software obsolescence in year twelve? | time | operations | Level annual reserve (USD m/yr) and peak refresh wave | Live |
| INS-10 | Heavy-haul rail capacity model How many passing loops and trainsets are needed to move a target mineral tonnage? | lender | transport | Annual corridor tonnage (Mtpa), trainsets and binding constraint | Live |
| INS-11 | Berth occupancy and demurrage estimator At what berth utilisation do vessel queues and demurrage costs spike? | lender | transport | Berth occupancy ratio, mean queue hours and demurrage | Live |
| INS-12 | IWA water balance calculator How is utility water loss split between physical leakage and unbilled commercial consumption? | auditor | utilities | Real vs apparent loss split and DMA payback | Live |
| INS-13 | Power feeder loss ranker Which substations deliver the fastest revenue recovery per smart meter installed? | lender | energy | Feeder rank order and revenue payback months | Live |
| INS-14 | Border gate throughput model How many automated border gates clear a peak wide-body arrival wave inside target wait time? | time | aviation | Peak queue length, wait time and officer desk load | Live |
| INS-15 | Social security coverage projector How do payroll interoperability and mobile channels lift active contributor ratios? | time | social | Active contributor ratio and net contribution yield | Live |
| INS-16 | Value-chain should-cost comparator How does a delivered mine-to-ship cost compare against independent unit benchmarks? | lender | resources | Delivered FOB cost per tonne vs benchmark ceiling | Live |
| INS-17 | Sovereignty architecture scorer Does a proposed platform keep data, keys, interfaces and code under State control? | time | technology | Ten-control sovereignty score and critical gap flags | Live |
| INS-18 | Evidence maturity grader What share of a study rests on measured records versus assumptions with sensitivity bounds? | auditor | cross-sector | Temper grade and measured-claim coverage ratio | Live |
02 · Empirical motivation
Public-record evidence shows that concessions rarely fail on abstract technology; they fail on unexamined cover ratios, untraceable tolerances and unfunded mid-term renewals.
Share of over 1,000 infrastructure concessions renegotiated in the World Bank empirical dataset (41.5% excluding telecoms).
Five-year cumulative default rate of revenue-resilient infrastructure loans versus 5.4% for non-resilient debt.
Maximum permissible error for custody-transfer liquid hydrocarbon measuring systems under OIML R 117-1.
Standard 15 to 30 year infrastructure concession duration requiring funded mid-term refresh waves and localisation.
Eight instruments test the lender's heat, five test the auditor's heat, and five test the heat of time.
Source: Tie Wang open instrument catalogue and public model registry
03 · Engineering discipline
Every open tool obeys the same four-stage deterministic pipeline so browser outputs, unit tests and exported tables cannot drift apart.
Every control carries explicit physical or financial units, hard numeric clamps, URL parameter encoding and an illustrative tag on defaults.
Invariant: NaN, negative and out-of-range parameters sanitise deterministically before entering the equation core.
Four-stage verification pipeline: bounded inputs, pure TypeScript model with 12+ unit tests, SVG and table rendering, and local CSV/Markdown export.
Source: Tie Wang instrument engineering contract (deterministic browser models with automated unit-test suites)
04 · Scope and limitations
An illustrative screening instrument exposes structural sensitivities early; it never replaces site-specific primary data, statutory tax rulings or signed lender term sheets.
Every default parameter across the eighteen tools is marked illustrative and documented verbatim in the method note. Public-record benchmarks, such as World Bank evidence that renegotiated concessions reopen after an average of Sourced ppp-3 · 2004 Average elapsed time between concession award and contract renegotiation across the World Bank 1,000-contract concession dataset World Bank, Granting and Renegotiating Infrastructure Concessions: Doing It Right, 2004 Open public record ↗ or that Sourced iff-3 · 2020 Share of gold in that estimated extractive export under-invoicing UNCTAD, Economic Development in Africa Report 2020 Open public record ↗ of estimated African extractive export under-invoicing involves gold, establish why sensitivity bounds matter. Real project sizing begins only when measured baselines replace illustrative defaults.
Open browser models abstract away jurisdiction-specific tax treaties, multi-tranche debt sculpting, local currency convertibility mechanics and physical site surveys. When Tie Wang conducts a definitive feasibility study, each open model expands into a full audit-traced Excel workbook whose outputs drive the written submission directly so figures cannot diverge between tables and prose.
05 · Putting instruments to work
Select the instruments matching your mandate, export the basis note and inspect the underlying methodology.
Test fee-waterfall priority, OIML error limits and localisation speeds before drafting tender schedules.
Exported Markdown basis attached to committee terms of reference
Run DSCR shock envelopes, Monte Carlo equity distributions and renewal-wave reserves against credit floors.
URL-pinned stress scenarios reproducible by independent advisers
Check rail loop headways, gold lot tolerances and CDR re-rating variance before agreeing interface protocols.
CSV schedules benchmarked against existing field plant
Quantify register-first capital avoidance and academy cohort capacity required to meet national staffing clauses.
Phased capital and recruitment schedule for partner alignment