Utility · Privacy by architecture
No cookies. No third-party requests.
This site is compiled as static files with self-hosted fonts and a local search index. Reading it sets zero cookies and contacts zero external servers.
Architectural guarantee
Measured zero-tracking posture
Every asset required to display, animate and search this website is bundled within the static build. No advertising pixel, telemetry beacon, external font host or third-party script is included.
Verified across page loads and interactive controls in headless browser audits.
Zero external hosts contacted during load, scroll, search or instrument execution.
No analytics SDK, session replay, fingerprinting script or consent broker.
What stays in your browser
Local-only preferences and calculations
| Browser mechanism | Used by this site | Behaviour and scope |
|---|---|---|
| HTTP or JavaScript cookies | None (0) | This site never sets, reads or transmits any first-party or third-party cookie. |
| Third-party network requests | None (0) | All fonts, stylesheets, scripts, SVG marks and Pagefind search shards are self-hosted on this origin. |
| Browser localStorage (tw-theme) | Optional, on click only | Remembers your chosen Paper or Iron colour theme locally inside your browser; never sent over the network. |
| Browser localStorage (tw-calm) | Optional, on click only | Remembers your Calm motion toggle locally inside your browser; never sent over the network. |
| Interactive tools & enquiry form | Local execution only | Model calculations, CSV/Markdown exports and enquiry .txt drafts run solely inside your browser. |
Source: Static build offline verification harness
When you toggle between Paper and Iron themes or enable the Calm motion switch in the site header, two plain
flags are stored locally in your browser's localStorage so your preference persists as you move
between pages. Clearing site data in your browser removes them immediately.
When you use an interactive model under Instruments, parameter values may be encoded in the page URL query string so you can copy and share a specific scenario. When you draft a brief on the Contact page, the file is generated locally in memory and downloaded as plain text; no form payload is posted to any server.
External links and verification