Skip to main content
Tie Wang Tie Wang Tie Wang Tie Wang
Search
Tie Wang · 22 Menu Pages
Sitemap
15 · Sources

Where does every public-record figure cited across the site originate?

Proof · Public-record provenance wall

Every public figure has an origin.

Tie Wang publishes zero unsourced statistics. Every external numeral on this site resolves to a dated institutional record, an international standard or a peer-reviewed dataset with a direct HTTPS link.

Provenance wall · kind × year × citations Sourced
World Gold Council (2026) · 5 cited fact(s) UN Trade and Development (UNCTAD) (2026) · 4 cited fact(s) United Nations Office for Disaster Risk Reduction (UNDRR) (2026) · 4 cited fact(s) World Health Organization (WHO) (2026) · 4 cited fact(s) U.S. Energy Information Administration (2026) · 3 cited fact(s) International Chamber of Shipping (ICS) (2026) · 2 cited fact(s) World Bank (2026) · 1 cited fact(s) World Bank (2026) · 1 cited fact(s) UN Trade and Development (UNCTAD) (2026) · 1 cited fact(s) Extractive Industries Transparency Initiative (2026) · 1 cited fact(s) Extractive Industries Transparency Initiative (EITI) (2026) · 1 cited fact(s) Early Warnings for All (citing Global Commission on Adaptation) (2026) · 1 cited fact(s) World Bank (2026) · 1 cited fact(s) International Air Transport Association (IATA) (2025) · 6 cited fact(s) Food and Agriculture Organization (FAO) (2025) · 6 cited fact(s) U.S. Geological Survey (2025) · 5 cited fact(s) International Union of Railways (UIC) (2025) · 5 cited fact(s) UN Trade and Development (UNCTAD) (2025) · 4 cited fact(s) World Trade Organization (WTO) (2025) · 4 cited fact(s) Food and Agriculture Organization (FAO) (2025) · 4 cited fact(s) World Health Organization (WHO) (2025) · 4 cited fact(s) World Health Organization (WHO) (2025) · 4 cited fact(s) World Steel Association (2025) · 4 cited fact(s) International Air Transport Association (IATA) (2025) · 3 cited fact(s) U.S. Geological Survey (2025) · 3 cited fact(s) GSMA (2025) · 3 cited fact(s) International Telecommunication Union (ITU) and UNESCO (2025) · 3 cited fact(s) GSMA (2025) · 3 cited fact(s) U.S. Energy Information Administration (2025) · 2 cited fact(s) World Bank (2025) · 2 cited fact(s) U.S. Energy Information Administration (2025) · 2 cited fact(s) U.S. Geological Survey (2025) · 2 cited fact(s) United Nations Office of Counter-Terrorism (UNOCT) (2025) · 1 cited fact(s) United Nations Office of Counter-Terrorism (UNOCT) (2025) · 1 cited fact(s) World Trade Organization (WTO) (2025) · 1 cited fact(s) ICC International Maritime Bureau (IMB) (2025) · 1 cited fact(s) Food and Agriculture Organization (FAO) (2025) · 1 cited fact(s) U.S. Geological Survey (2025) · 1 cited fact(s) U.S. Geological Survey (2025) · 1 cited fact(s) U.S. Geological Survey (2025) · 1 cited fact(s) U.S. Geological Survey (2025) · 1 cited fact(s) U.S. Energy Information Administration (2025) · 1 cited fact(s) United Nations (2025) · 1 cited fact(s) World Bank (2024) · 7 cited fact(s) International Renewable Energy Agency (IRENA) (2024) · 5 cited fact(s) UN Trade and Development (UNCTAD) (2024) · 5 cited fact(s) World Bank (2024) · 3 cited fact(s) UNICEF (2024) · 3 cited fact(s) European Investment Bank (GEMs Consortium) (2024) · 3 cited fact(s) World Bank (2024) · 3 cited fact(s) UNITAR and International Telecommunication Union (ITU) (2024) · 3 cited fact(s) GSMA (2024) · 2 cited fact(s) International Maritime Organization (2024) · 2 cited fact(s) World Bank (2024) · 2 cited fact(s) International Maritime Organization (IMO) (2024) · 2 cited fact(s) U.S. Energy Information Administration (2024) · 2 cited fact(s) GSMA (2024) · 2 cited fact(s) Climate and Clean Air Coalition (citing UNEP Global Waste Management Outlook 2024) (2024) · 2 cited fact(s) UNICEF and World Health Organization (WHO) (2024) · 2 cited fact(s) World Gold Council (2024) · 1 cited fact(s) UNCTAD (2024) · 1 cited fact(s) 3GPP TS 32.298 (2024) · 1 cited fact(s) IEC 62443 (2024) · 1 cited fact(s) GSMA Mobile Money API (2024) · 1 cited fact(s) GSMA TAP3 and NRTRDE (2024) · 1 cited fact(s) International Telecommunication Union (2024) · 1 cited fact(s) UK Government Digital Service (GOV.UK) (2024) · 1 cited fact(s) World Gold Council (2024) · 1 cited fact(s) International Labour Organization (ILO) (2023) · 5 cited fact(s) Information Commissioner's Office (UK ICO) (2023) · 2 cited fact(s) World Bank (2023) · 2 cited fact(s) ISO 20022 (2023) · 1 cited fact(s) IEC 62056 series (2023) · 1 cited fact(s) EITI Standard 2023 (2023) · 1 cited fact(s) European Union Regulation 2023/1115 (2023) · 1 cited fact(s) API MPMS (2023) · 1 cited fact(s) World Wide Web Consortium (W3C) (2023) · 1 cited fact(s) Communications Fraud Control Association (2023) · 1 cited fact(s) World Wide Web Consortium (W3C) (2023) · 1 cited fact(s) World Wide Web Consortium (W3C) (2023) · 1 cited fact(s) World Wide Web Consortium (W3C) (2023) · 1 cited fact(s) UNESCAP (citing CCTT) (2023) · 1 cited fact(s) International Labour Organization (ILO) (2023) · 1 cited fact(s) Food and Agriculture Organization (FAO) (2022) · 4 cited fact(s) US Internal Revenue Service (2022) · 3 cited fact(s) World Bank (citing International Monetary Fund) (2022) · 2 cited fact(s) World Bank (2022) · 2 cited fact(s) World Bank (citing UNU-WIDER Government Revenue Dataset) (2022) · 2 cited fact(s) International Energy Agency (2022) · 1 cited fact(s) ISO/IEC 27001:2022 (2022) · 1 cited fact(s) ISO 6346:2022 (2022) · 1 cited fact(s) World Customs Organization (2022) · 1 cited fact(s) United Nations Office on Drugs and Crime (UNODC) (2022) · 1 cited fact(s) World Bank (2022) · 1 cited fact(s) World Bank (2022) · 1 cited fact(s) World Bank (2021) · 3 cited fact(s) World Bank (2021) · 2 cited fact(s) World Bank (2021) · 1 cited fact(s) ISO 11426:2021 (2021) · 1 cited fact(s) OpenAPI Specification 3.1.0 (2021) · 1 cited fact(s) World Customs Organization (2021) · 1 cited fact(s) W3C WebAuthn (2021) · 1 cited fact(s) UN Trade and Development (UNCTAD) (2021) · 1 cited fact(s) UNCTAD (2020) · 3 cited fact(s) World Bank (2020) · 2 cited fact(s) UN/CEFACT Recommendation 33 (2020) · 1 cited fact(s) International Organization of Legal Metrology (OIML) (2019) · 3 cited fact(s) OIML R 117-1:2019 (2019) · 2 cited fact(s) OIML R 117-1:2019 (2019) · 2 cited fact(s) Liemberger and Wyatt (2019) · 2 cited fact(s) ISO 17089-1:2019 (2019) · 1 cited fact(s) ISO/IEC 27701 (2019) · 1 cited fact(s) African Development Bank (2018) · 2 cited fact(s) ISO/IEC 17025:2017 (2017) · 1 cited fact(s) U.S. General Services Administration (Section508.gov) (2017) · 1 cited fact(s) Intersoft Consulting (reproducing EU Regulation 2016/679) (2016) · 2 cited fact(s) Suri and Jack (2016) · 1 cited fact(s) OECD Due Diligence Guidance (3rd ed.) (2016) · 1 cited fact(s) ITU-T Y.1564 (2016) · 1 cited fact(s) National Institute of Standards and Technology (NIST) (2015) · 2 cited fact(s) National Institute of Standards and Technology (2015) · 1 cited fact(s) National Bureau of Economic Research (NBER) (2014) · 3 cited fact(s) ISO 4064 series (2014) · 1 cited fact(s) International Water Association (2014) · 1 cited fact(s) ITU-R M.1371 (2014) · 1 cited fact(s) World Bank (2014) · 1 cited fact(s) Internet Engineering Task Force (IETF) (2013) · 2 cited fact(s) Saïd Business School (arXiv:1304.4525) (2013) · 2 cited fact(s) National Bureau of Economic Research (NBER) (2013) · 2 cited fact(s) World Bank (2012) · 1 cited fact(s) Kleven (2011) · 2 cited fact(s) Harvard Business Review / Saïd Business School (arXiv:1304.0265) (2011) · 2 cited fact(s) BIPM / JCGM (2008) · 3 cited fact(s) World Bank (2007) · 2 cited fact(s) ISO 18185 series (2007) · 1 cited fact(s) World Customs Organization (2006) · 1 cited fact(s) Transport Reviews (arXiv:1304.4476) (2004) · 5 cited fact(s) World Bank (2004) · 3 cited fact(s) International Maritime Organization (2002) · 2 cited fact(s) National Institute of Standards and Technology (NIST) (2002) · 2 cited fact(s) Internet Engineering Task Force (IETF) (2001) · 1 cited fact(s) ISO 5024:1999 (1999) · 2 cited fact(s) World Trade Organization (1994) · 1 cited fact(s) UNCLOS Part V (1982) · 1 cited fact(s)

Showing all 144 sources (289 canonical records) · dot area scales with citation count

Inspect source grading
289 canonical entries · 144 distinct public records · cutoff 2026-11

01 · Evidence discipline

How public records enter and hold their seat in the Tie Wang register

Every external statistic on the site must pass four mechanical checks before a build succeeds: unique canonical identifier, named institutional publisher, live HTTPS URL and zero client-identifying leakage.

Canonical fact entries Derived
289

Deduplicated public-record facts across the site bibliography, identical to the downloadable CSV and JSON datasets.

Distinct public sources Derived
144

Unique institutional publications, standards and peer-reviewed papers referenced across the site.

Grade A primary records Derived
278

Entries taken directly from international standards bodies, multilateral statistical tables or statutory agencies.

Grade B secondary citations Derived
11

Working papers or syntheses quoting an underlying dataset, flagged explicitly for reader verification.

Why provenance is an engineering control, not a footnote

In infrastructure finance and sovereign revenue reform, a single misquoted benchmark can distort a tariff model, a sensitivity range or a parliamentary brief. Under Tie Wang's second heat, the auditor's heat, no author may paste an unattributed percentage into narrative prose. Every external number is stored in the canonical register, rendered with an interactive inline citation popover, and audited on every build by automated verification gates.

For example, when Tie Wang discusses third-party reporting versus self-declaration, the page cites the randomised audit finding of Sourced tax-2 · 2011 Evasion rate on self-reported income in the same experiment Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011 Open public record ↗ evasion on self-reported income against Sourced tax-1 · 2011 Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011 Open public record ↗ on third-party reported income, or when discussing liquid custody transfer, it cites the Sourced met-1 · 2019 Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products) OIML R 117-1:2019, Dynamic measuring systems for liquids other than water Open public record ↗ system maximum permissible error under OIML R 117-1. Clicking any inline figure opens its publisher, title, year and direct public-record URL without leaving the reading position.

Source grading and client-blind filtering

Every entry in the canonical register carries an explicit evidence grade. Grade A records come directly from primary institutional issuers: ISO, IEC, OIML, NIST, IETF, IMO, ICAO, WCO, World Bank, UNCTAD, IEA, ITU, ILO, WHO, EIA and peer-reviewed journals. Grade B records are institutional syntheses or working papers that cite an underlying primary dataset; their source string states both the publishing body and the cited authority so a diligence team can walk back to the original release.

All records also pass the client-blind filter before shipping. Public statistics may reference global aggregates, regional blocks or non-restricted third-party studies, but no figure ever discloses a host authority, a private counterparty, a contract fee or an engagement location. Where an example requires illustrative numbers, those figures are never placed in the sourced register and instead carry a visible Illustrative chip.

02 · Composition of the evidence base

Publication recency and institutional diversity across the fact register

Toggle between publication-year strata and publisher-kind shares to inspect how the evidence base balances recent empirical data against enduring technical standards.

Distribution of canonical cited facts by publication band and publisher category
Derived
Pre-2015 43 (23 src) 2015 to 2018 13 (9 src) 2019 to 2021 29 (17 src) 2022 to 2023 54 (27 src) 2024 49 (25 src) 2025 to 2026 101 (43 src) RECENT EMPIRICAL RELEASES (2024 TO 2026) PAIR WITH FOUNDATIONAL STANDARDS (PRE-2022)

The register holds 289 canonical entries across 144 distinct sources: Intergovernmental & multilateral 155, Standards body 42, Government & regulator 32, Industry & trade 41, Peer-reviewed academic 19.

Source: Computed at build time from the canonical Tie Wang fact register (identical to /data/facts.json; cutoff 2026-11)

Data-table alternative: canonical entries and distinct sources by publication band Derived
Publication bandDistinct sourcesCanonical entries
Pre-20152343
2015 to 2018913
2019 to 20211729
2022 to 20232754
20242549
2025 to 202643101

Source: Derived from the canonical Tie Wang fact register at build time

03 · Complete searchable register

Filter every cited fact by publisher kind, evidence grade, year or text

The initial slice renders statically for instant load; filtering, searching or loading more fetches the full canonical register from /data/facts.json.

Showing 20 of 289 canonical cited facts
  1. fin-1 · Intergovernmental & multilateral · 2021 Grade A

    76%

    Adults worldwide with an account at a financial institution or a mobile money provider in 2021

    World Bank, Global Findex Database 2021

  2. fin-2 · Intergovernmental & multilateral · 2021 Grade A

    33%

    Adults in Sub-Saharan Africa with a mobile money account in 2021

    World Bank, Global Findex Database 2021

  3. gold-1 · Industry & trade · 2024 Grade A

    about 20%

    Share of global mined gold supply that comes from artisanal and small-scale mining

    World Gold Council, Artisanal and small-scale gold mining

  4. id-1 · Intergovernmental & multilateral · 2021 Grade A

    850 million

    People worldwide estimated to lack an official proof of identity

    World Bank, Identification for Development (ID4D) Global Dataset 2021

  5. iff-1 · Intergovernmental & multilateral · 2020 Grade A

    USD 88.6bn

    Estimated illicit capital flight from Africa per year, about 3.7 percent of the continent's GDP

    UNCTAD, Economic Development in Africa Report 2020

  6. iff-2 · Intergovernmental & multilateral · 2020 Grade A

    USD 40bn

    Estimated export under-invoicing of extractive commodities from Africa in 2015

    UNCTAD, Economic Development in Africa Report 2020

  7. iff-3 · Intergovernmental & multilateral · 2020 Grade A

    77%

    Share of gold in that estimated extractive export under-invoicing

    UNCTAD, Economic Development in Africa Report 2020

  8. infra-1 · Intergovernmental & multilateral · 2018 Grade A

    USD 130bn to 170bn

    Estimated annual infrastructure investment needs of Africa

    African Development Bank, African Economic Outlook 2018

  9. infra-2 · Intergovernmental & multilateral · 2018 Grade A

    USD 68bn to 108bn

    Estimated annual infrastructure financing gap of Africa

    African Development Bank, African Economic Outlook 2018

  10. met-1 · Standards body · 2019 Grade A

    0.3%

    Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products)

    OIML R 117-1:2019, Dynamic measuring systems for liquids other than water

  11. met-2 · Standards body · 2019 Grade A

    0.2%

    Maximum permissible error of the meter alone in the same accuracy class

    OIML R 117-1:2019, Dynamic measuring systems for liquids other than water

  12. met-3 · Standards body · 1999 Grade A

    15 °C and 101.325 kPa

    Standard reference conditions for petroleum and liquid petroleum products

    ISO 5024:1999, Petroleum liquids and liquefied petroleum gases, measurement, standard reference conditions

  13. mm-1 · Industry & trade · 2024 Grade A

    1.75 billion

    Registered mobile money accounts worldwide in 2023

    GSMA, State of the Industry Report on Mobile Money 2024

  14. mm-2 · Industry & trade · 2024 Grade A

    USD 1.4 trillion

    Value of mobile money transactions processed worldwide in 2023

    GSMA, State of the Industry Report on Mobile Money 2024

  15. mm-3 · Peer-reviewed academic · 2016 Grade A

    194,000

    Kenyan households (about 2 percent) lifted out of extreme poverty by access to mobile money

    Suri and Jack, Science 354(6317), 2016

  16. pow-1 · Intergovernmental & multilateral · 2022 Grade A

    600 million

    People in Africa without access to electricity, about 43 percent of the population

    International Energy Agency, Africa Energy Outlook 2022

  17. sea-1 · Intergovernmental & multilateral · 2024 Grade A

    over 80%

    Share of world merchandise trade by volume carried by sea

    UNCTAD, Review of Maritime Transport

  18. sea-2 · Intergovernmental & multilateral · 2002 Grade A

    300 GT

    Gross tonnage from which ships on international voyages must carry an automatic identification system (AIS)

    International Maritime Organization, SOLAS Chapter V, Regulation 19

  19. sea-3 · Intergovernmental & multilateral · 2024 Grade A

    1 January 2024

    Date from which electronic data exchange through a maritime single window became mandatory for ports under the FAL Convention

    International Maritime Organization, Convention on Facilitation of International Maritime Traffic

  20. std-11426 · Standards body · 2021 Grade A

    ISO 11426:2021

    Jewellery and precious metals: determination of gold by cupellation (fire assay)

    ISO 11426:2021

Or download all 289 canonical records as CSV / JSON →

04 · What is not yet known

Scope limits, publication lag and revision protocol

An honest provenance register states what its numbers cannot prove alongside what they establish.

Publication lag and link permanence

Multilateral datasets frequently report two to three years behind the current calendar because national statistical offices reconcile trade, health and fiscal accounts retrospectively. Each record preserves both its publication date and the reference year of the underlying observation so readers never conflate a 2026 report date with a 2022 measurement period.

How corrections enter the register

When an issuer publishes a revised edition or withdraws a series, Tie Wang updates the underlying canonical entry, records the new cutoff date and re-runs the automated fact check and claims audit across every built page. Because every figure renders from one verified key, no orphaned stale number can survive in prose.

05 · Continue the audit

Where each audience goes next from the provenance wall

Public authority 01

Inspect how cited figures bind into build-time claims audits so no statutory briefing carries an unverified statistic.

Read verification methods →
Lender & DFI 02

Download the complete deduplicated fact base as clean CSV or JSON files with original HTTPS URLs for independent credit verification.

Open data downloads →
Licensed operator 03

Review every metrological and interface standard designed against across custody transfer and copy-only telemetry.

Inspect standards rack →
Local partner 04

Cross-check technical vocabulary and plain answers built directly on this shared evidence register.

Open the FAQ desk →